Home > Uncategorized > piles in construction

piles in construction

January 14th, 2009 admin Leave a comment Go to comments

We've come across an exciting solution for people wanting to get rid of hemorrhoids or piles as its commonly known. Holly Hayden, who once was a sufferer of hemorrhoids, has completed her study on how to get rid of hemorrhoids, and has written a tell-all report to called H-Miracle.

Holly had tried everything possible and nothing worked. She then decided to try a home remedy which her grand mother told her about. This worked so Holly wanted to pass on the informtation to people who suffer from the embarrassing problem of piles.

Be sure to check out Holly's Hemorrhoid Cure now.

Click here now to find out how to get rid of hemorrhoids

Are bored piles consider heavy foundations?

I am asked to write about foundations(writing should include their use and construction too) for my year end assignment. Any help is appreciated.

Bored piles are constructed by pouring concrete into drilled holes in the ground. The length of bored piles are drilled until the rock beds or competent layer. Diameter of bored piles can range from 450mm to 4000mm. They can carry very heavy loads like those from skyscrapers, multistory car parts, etc. Thus in this sense bored piles can be consider heavy foundation.

San Jose City Hall construction: pile driver.

Share and Enjoy:
  • Print
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google Bookmarks
  • Blogplay
  1. No comments yet.
  1. No trackbacks yet.